Saturday, March 8, 2008

Week 10 of IA

Yeah...almost half done with my IA. Just want to list down my projects I have done during IA. 3 words : interesting, exciting, enriching ^^ Thanks God for giving me this company, can't be thankful enough...My purpose to list them is only for keeping this as my reference in the future, no one knows if I will lose my logbook someday. Ha3...My NTU Tutor will come next week, hopefully everything is going to be fine :) Yap, as promised, list of my projects

- Proposed Pasir Ris Sport Complex and Tampines Stormwater Tank : Design of fin wall (additional to diaphragm wall) and waler beam for the watertank

- Structural Inspection to LTA (Former KK Hospital)

- Beam Design AC (28-storey office in Battery Road)

- Learning Series: Design and Construction of Marine Cofferdam for Gatehouse Structure of Punggol Reservoir

- Soil design parameter : New Pathology, Education, Research Building at SGH

- Modelling and analysis of Raft and Column load taking for Fusionopolis Phase 2A

- Modelling and Design of Goal-post Truss of Esplanade Outdoor Theatre

- Consolidation Settlement using Prefabricated Vertical Drain and Surchaging : Dunman High School Upgrading Track and Field

- Revision on Design and Analysis of temporary earth retaining structure (strut, waler, and splay) of Labrador Park Station (Circle Line Stage 5)

Yeah, great experience with great people...once again thanks god